In response to various queries that we receive from time to time, we have included below a few FAQs relating to the reservoir and dam works:

  • When will we be able to walk across the dam?

If it is safe to do so, we are hoping to temporarily open the footpath along the crest of the dam to walkers over the Christmas period when the site will be shut down. This, however, depends on the stage that the works at the Nine Foot Pool and in particular, the overflow bridge, have reached at that time. Unfortunately, we will then have to reclose the access over the bridge in the New Year to enable us to complete the outstanding works and the path across the dam will then remain closed until the project is completed in Spring 2012.

  • When will the dam work be finished and the site cleared?

Subject to weather conditions over the winter which could delay progress, we are currently planning to complete the works and clear the site by late March/early April 2012.

  • Where does the water come from that feeds the reservoir other than rain water?

The reservoir has what is known as a “catchment area”, an area of land over which rain water, ground water and some drainage run-off collects into various streams and watercourses which ultimately flow into the reservoir.

The catchment area for Chasewater Reservoir is about 9 square kilometres and lies mainly to the north of the reservoir. The main dam was built across the valley of the eastern Crane Brook which rises in high ground in Burntwood and flows into the reservoir along Blackman’s Gutter and into the inlet where the sailing club is now sited.

The secondary, western dam retains streams such as the Big Crane Brook from Biddulph’s Pool and other ponds to the north which before disturbance by mining subsidence and open cast mining flowed into the River Penk to the west.

  • When will the sailing and powerboat clubs be back open?

This is entirely dependant on the water level in the reservoir and, therefore, the rate at which it refills. The reservoir level is currently around 144 metres above ordnance datum (AOD). Based on historical records and current rates of rainfall, it has been estimated that it may be the summer of 2013 before the reservoir starts to reach normal operating levels of between 150 and 152 m AOD. However, the sailing and power boat clubs can operate in lower water levels than this and so may be able to open a little earlier.

  • Will Pool Road be reopened, when the dam is finished? If not, why?

It is our intention to seek to close Pool Road to all traffic other than for access to the properties on Pool Road after completion of the works, however, this will be subject to a statutory consultation exercise.

  • Will there be a DVD released of the works involving the dam and of the hidden chamber?

We don’t anticipate releasing a DVD as such but video footage of the drawdown culvert and hidden chamber was included in an earlier blog update.

  • Will they remove all the debris and plants before it refills?

Some willow growth will be removed but other plant growth will not. This will die out naturally as the reservoir fills.
Debris will be removed where it might form a hazard to boat traffic or is regarded as waste. 

  • Will fish be put back into the reservoir?

There is no requirement or intention to put any fish back. We estimate that a small proportion of the total fish stock was removed. The majority of fish removed were predatory which may actually benefit the water body as smaller prey species may now be more prolific. In addition there will be a large flush of nutrients through re-fill which will ultimately facilitate the quick expansion of the fish populations.

  • Can you explain, ‘What is the plug that has been put back in?’

A critical part of the works was to ensure that the brickwork tunnel (the “drawdown culvert”) which runs under the eastern dam from the bed of  reservoir and which is the means by which water is released into the canal system was in good condition and fully functional.

Until this work was complete, water levels in the reservoir had to be kept down. Having completed these works, there is now no need to continue to release water from the reservoir and it can now be allowed to refill naturally.

  • Is there really a plug?

There is no actual plug but the valves that control the flow of water out of the reservoir are now shut.
 

 

3 Responses to “FAQs ….”

  1. Jon says:

    If all the water went into the canal, cant we pump it back out into the main lake?

  2. ben says:

    lizzie once the lake is at a safe level what is your plan for the angling on the water as i am interested in this due to a understanding and also good information that there may be a low stock of larger fish in the water and i am interested in targeting these fish if you could email me please this would be of much appreciation

    ben

  3. lizziethatcher says:

    I’ll pass your query onto the team at SCC as ask them to email you. Cheers

Leave a Reply